How long does it take to do a bathroom renovation​? A typical bathroom remodel takes from ten days to three weeks. But that’s just the timeline for the renovation process only, if it does not experience any issues.

In reality, the renovation process starts much earlier than when you start removing the appliances and fixtures. While it is much easier than remodeling, in which you change the entire layout instead of working on the same design, it is still a time-consuming process. It is broken into different stages, and each stage takes longer than the general timeline, and it also varies depending on your needs.

So, let’s take a look at the time you need for a bathroom renovation.

The 4 Main Types of Bathrooms

We all know bathrooms differ in size and style. Some bathrooms are spacious and give you a full spa-like experience, while some are narrow and only give room for a toilet and a sink. While bathrooms can be categorized according to different traits like style and purpose, the main categorization is based on size.

That said, there are four main types of bathrooms, which are:

  • Half Bathroom (Powder Room): Specialized for guests and only has a commode and sink, no shower
  • Three-Quarter Bathroom: The typical bathroom in almost everyone’s home that contains a shower, a commode, and a sink
  • Full Bathroom: Includes all four fixtures, i.e., a toilet, sink, shower, and bathtub
  • Master Bathroom (Primary Bath/En-Suite): Typically the one you see in movies, and may include extras like double vanities, custom tiling, or a walk-in shower

How Long Does It Take to Do a Bathroom Renovation?

While it is true that the general bathroom renovation timeline is between ten days and three weeks, it depends on the bathroom type.

So, if you need an idea for how long does it take to do a bathroom renovation​, here’s how generally the timeline is broken into different stages:

 

Renovation Stage General Timeline
Pre-Construction Phase 1-4 weeks
Demolition 1-2 days
Plumbing and Electrical Work 2-4 days
Framing and Structural Adjustments 1-3 days
Drywall and painting 2-4 days
Flooring Installation 1-3 days
Tiling and Custom Work 3-7 days
Fixture Installation 2-4 days
Finishing Touches 1-2 days

 

However, several factors impact the general timeline, which are discussed below:

Bathroom Size and Type

The size and type of bathroom massively impact the overall timeframe. Even a major renovation in a powder room takes up to two weeks, mostly. On the other hand, master bathrooms are much larger in size and can take up to four to six weeks for normal renovation.

Scope of Work

Another obvious factor is the scope of work. If you only need cosmetic changes, it generally takes one to five days. Meanwhile, a full bathroom remodel takes between three and six weeks.

Plumbing and Electrical Work

A fixture replacement is generally short, but if electrical and plumbing work is required, the time will increase. Generally, it extends the time from three or four days to five or seven days.

Custom Tiling and Design Choices

Standard tiling work takes about three to four days. However, if you opt for intricate tile patterns, custom mosaics, or luxury finishes, which people mostly do, expect the timeline to increase by another 5–7 days.

Material Availability

If all materials are ready and on-site, there are no delays. But if special items like custom vanities, imported tiles, or luxury fixtures need to be ordered, it can push the project back by one to two weeks.

General Contractor and Crew Efficiency

A skilled and well-organized contractor in Georgia can complete most bathroom remodels within ten days and three weeks. On the other hand, smaller or less experienced crews may need five to ten days more on top of that.

Permits and Inspections

Depending on your location, permits and inspections can add three to seven days to the project. These delays are often beyond your contractor’s control.

Unexpected Issues

Sometimes hidden problems are revealed during demolition, such as mold, leaks, or structural damage. Fixing these issues can delay the remodel by an additional one or two weeks.

🚿 Ready for a Bathroom Renovation?
Get your free consultation today and turn your bathroom into a stylish, functional space you’ll love!

So, How Long Does it Take to Do a Bathroom Renovation?

The general answer to the question, “How long does it take to do a bathroom renovation?” is ten days to three weeks. However, the right answer is that it varies according to different factors. Small renovations like changing the paint take only one to three days. But major renovations like a full bathroom remodel can take up to eight weeks, or sometimes even more.

What you really need to know is how much time a professional remodeler gives, and how they break down the stages. Reputable home and bathroom renovators and remodelers like us follow a systematic flow and keep you updated throughout.

Therefore, hire a reputable bathroom renovator in Georgia, and make your bathroom both functional and beautiful, completed on time and within your budget.

FAQs About Bathroom Renovation

How long does it take to do a bathroom renovation?

The exact answer depends upon different factors. Different aspects like scope of work, bathroom size, plumbing and electrical work, and custom tiling affect the total time. Small updates like paint or fixture replacements may only take a few days, while a full bathroom remodel project or master bathroom renovation can extend to six to eight weeks.

What is a realistic budget for bathroom renovation?

The budget for remodeling a bathroom varies depending on its size, finishes, and layout changes. On average in the U.S., you can expect the following ranges:

  • Small bathroom: $5,000 – $10,000
  • Mid-size bathroom: $10,000 – $20,000
  • Master bathroom: $20,000 – $40,000+

A realistic budget should also account for unexpected issues like hidden water damage, outdated wiring, or relocating plumbing.

How much to redo a 10x10 bathroom?

On average, it costs anywhere between $10,000 and $15,000. However, it depends on the scope of your project.

  • Budget remodel: $10,000 – $15,000 (basic fixtures, stock vanities, simple tiling)
  • Mid-range remodel: $20,000 – $30,000 (custom tiling, upgraded plumbing and electrical work, semi-custom cabinetry)
  • High-end remodel: $35,000 – $50,000+ (luxury finishes, relocating plumbing, custom vanities, spa-like features)

Keep in mind, the final price also depends on the size, the scope of work, and whether any unexpected issues like water damage or outdated wiring are discovered during the remodeling process.

Can I renovate my bathroom for $5000?

Yes, but it will likely be a small bathroom renovation or a basic refresh. With a $5,000 budget, you can do the following:

  • Replace the vanity, toilet, or sink
  • Repaint or install new flooring
  • Update lighting and fixtures
  • Do minor plumbing and electrical updates without relocating fixtures

For a full bathroom remodel with custom tiling or layout changes, $5,000 is not realistic.